• 回答数

    4

  • 浏览数

    301

颖颖emma
首页 > 论文问答 > 水泥技术期刊投稿

4个回答 默认排序
  • 默认排序
  • 按时间排序

朝天辣椒smile

已采纳
274 MILLION TPY PORTLAND CEMENT PRODUCTION PLANTCONTRACT DOCUMENTDoc 1Production Performance GuaranteesRevision 2003 A) Production Performance Guarantees for “Tests on Completion”A1) Individual Tests of Area, System or Sub-systemLimestone Quarry Operation – for information to CP2 -Capacity: 65,000 t per week (dry)Guaranteed 1,700 t/h (dry) Feed Moisture 5 % Max Feed size: 5 m MaxTest Duration:: 3 Test each 6 hoursMaximum interruption: no InterruptionQuaternary Quarry Operation – for information to CP2 -Capacity: 9,000 t per week (dry)Guaranteed 230 t/h (dry) Feed size: 5 m MaxFeed Moisture 13 % Min 27 % Average 40 % Max Test Duration:: 3 Test each 6 hoursMaximum interruption: no InterruptionLimestone/Quaternary CrusherGuaranteed output: > 1,100 t/h (dry)Feed size: 5 m Max Feed Moisture Limestone 5 % Max Quaternary 13 % Min Quaternary 27 % Average Quaternary 40 % Max Mix ratio Limestone 85 % Quaternary 15 % Guaranteed product size: <80mm 95 % <150mm 100 % Lifetime for hammers: 1250 Operation hours Test Duration: 3 Test each 6 hoursMaximum interruption: 5 Minutes for each testLimestone/Quaternary Long Belt ConveyorCapacity guaranteed > 1,250 t/h (dry)Limestone/Quaternary Mix Pre-Blending StorageFeed material: Product of the limestone/quaternary mix crusher Storage Capacity: > 50,000 t (dry) Stacker capacity guaranteed: > 1,200 t/h (dry) Reclaimer capacity guaranteed: > 520 t/h (dry) Blending effect: Standard deviation CaCO3 <5% Stacker: Test Duration: 3 Test each 6 hoursMaximum interruption: 5 Minutes for each testReclaimer: Test Duration: 3 Test each 6 hoursMaximum interruption: 5 Minutes for each test Raw Mill:Feed size: <80mm 95 % <150mm 100 % Feed Moisture H2O by weight 8 % Max Feed Composition Limestone/Quaternary 98 % MaxHigh Grade Limestone 15 % MaxIron Ore 6 % MaxSand 11 % Max Guaranteed output: ≥520 t/h (dry) Output fineness: ≤12% residue 80 micron ≤ 1% residue 200 micron Output moisture: H2O by weight ≤ 1 % Lifetime guarantee: Roller table and roller liners ≥15,000 Operating hoursand ≥ 7,275,000 Tons of raw meal Test Duration: 2 Test each 24 hours Maximum interruption: One time 15 Minutes for each testRaw Meal Homogenizing Silo:Capacity: 19,000 Ton Standard deviation in CaO of discharge raw meal guaranteed 2 % Max Homogenizing ratio at 50% filling degree guaranteed 5:1 Min Degree of emptying guaranteed 98 % Min Test Duration: 1st Test 36 Hours2nd Test 72 Hours Maximum interruption: 1st Test 2 Times 15 minutes2nd Test 2 Times 30 minutes Number of Samples: Not less than 1 sample per hourPreheater Kiln:Guarantees: Clinker quality for PII 5 cement has to be according to Chinese Regulations but of not less quality than specified in: Doc [Product Requirements ]Capacity ≥ 1,920,000 t of clinker in 320 daysresulting in ≥6,000 t clinker per day Free lime in clinker minimum 85% of production ≤ 0 % CaO maximum 15% of production ≤ 5% CaOCompression strength of clinker at 3,500+100cm^2/gr 3 days28 days >36 MPa >5 MPa Free lime (CaO) standard deviation 12 Specific heat consumption: ≤ 737 kcal/kg clinkerDust content after Preheater ≤ 50 g/Nm3 Fuel Distribution: Kiln fuel for guarantee test 40 %Calciner fuel for guarantee test 60 %Calciner: Design Guarantee fuel 100 % Anthracite Trial run for entitlement to Production Performance Tests: 7 continuous days ≥ 85 % of 6,000 t/d clinker resulting in > 35,700 t Maximum interruption in total: 105 minutes, raw meal feeding to kilnTest Duration: for producing minimum 18,000 ton of qualified clinker per test 3 tests (1 “on Completion” 2 “after Completion”) each test 72 Hours Maximum interruption: 15 Minutes per 24 hoursor 30 Minutes within 72 hoursClinker Cooler:Guarantees: Capacity of cooler for all size of Clinker fitting to kiln requirements > 6,000 t of clinker per day Clinker outlet temperature for all type of clinker (Above ambient temperature in the shade measured at the Cooler Building) ≤ 60 °C Cooler efficiency: ≥ 2 % At specific grate load: ≤ 45 t/d per m2At ambient temperature of: ≤30 °C Trial run for entitlement to Production Performance Tests: 7 continuous days ≥ 85 % of 6,000 t/d clinker resulting in > 35,700 t Maximum interruption in total: 105 minutes, stop of cooler driveTest Duration: for producing minimum 18,000 ton of qualified clinker per test 3 tests (1 “on Completion” 2 “after Completion”) each test 72 HoursMaximum interruption: 15 Minutes per 24 hoursor 30 Minutes within 72 hoursClinker Storage:Capacity 126,000 t clinker Guaranteed degree of emptying by gravity 87 % MinimumLifetime of Refractory Materials on Area 40:Kiln Inlet Zone 16,000 Operating hoursTransition zone Sintering zone 16,0008,000 Operating hoursOperating hoursPre-Heater and Calciner and Terliary Air Duct: 16,000 Operating hours Clinker cooler: High Temperature zone 10,000 Operating hoursLow Temperature zone 16,000 Operating hoursKiln hood: 10,000 Operating hoursCement Grinding:Guaranteed product temperature before silo ≤ 70 °CGuarantee performance PII 5 / PII 5 at 3,600 BlaineOn closed circuit mill (2 systems) 95 t/h eachOn open circuit mill (3 systems) 83 t/h eachIndicative performance data for Area 50: for each mill closed circuit kWh/t t/hPO 5 00 103PO 5 00 103PC 5 00 115for each mill open circuit kWh/t t/hPO 5 00 90PO 5 00 90PC 5 50 100 Guaranteed working hours of life time for lining and internal parts of mills: First Compartment Liners 15,000 Operating hoursSecond Compartment Liners 20,000 Operating hoursSlotted Plates for Partition 15,000 Operating hoursBlind Plates for Partition 15,000 Operating hoursSlotted Plates for outlet diaphragm 20,000 Operating hoursGrinding Media consumption 40 gram/tTest Duration for each mill: 2 times 24 hours Maximum interruption: 1 time 15 minutes each testCement Storage:Total capacity 90,000 t netSingle cell silo 2 x 1 cell each 15,000 t netDouble cell silo 4 x 1 cell each 10,000 t net 4 x 1 cell each 5,000 t net Guaranteed degree of emptying each silo 98 % MinimumRotary Packing Machines:Guaranteed total output for 50 kg bags: 2 x 100 t/h (loaded on rear open truck) Accuracy of Bag weight: According to Chinese For 20 single random bags of 50 kg, deviation in weight of each bag shall be not more or less than 500 Test Duration: 2 times 8 hours Maximum interruption: 15 minutes each test each Rotary Packing MachineBig Bag Loading Station:Guaranteed total output for 1,000 kg bags 1 x 40 t/hBulk Cement Truck Loading Station:Number of cement types to be loaded 5 Number of bulk loading systems 4 Guaranteed total output for each type of cement, measured from “Start Loading” to “End of Loading” 250 t/h for each Loading SystemBulk Cement Ship Loading:Guaranteed total loading time for barge of 300 dwt size from berthing to departure 75 minutesRaw Coal Ship Unloading:Unloading capacity guaranteed for 300 dwt ship size from berthing to departure 180 minutes Coal grain size <50 mm 95 %<80 mm 100 %Coal moisture content 12 % Maximum Test Duration: 2 tests each 3 ship Maximum interruption: none Coal Dust Silo:Guaranteed Total capacity 400 t coal dust Guaranteed degree of emptying 100 %Coal Mill:Feed size: <50mm 95 % <80mm 100 % Feed Moisture 12 % Max Feed Type Anthracite 100 % Guaranteed output: 45 t/h (dry) At output fineness: <5% residue 80 micron <5% residue 200 micron Output moisture: <1 % Lifetime guaranteed: Table liner and roller liners 15,000 Operating hoursbut not less than 675,000 Tons of Coal Dust Test Duration: 2 Test each 24 hours Maximum interruption: One time 15 Minutes for each testCoal Pre-Blending Storage:Coal grain size <50 mm 95 % min<80 mm 100 % max Coal moisture content, H2O by weight 12 % Maximum Storage capacity guaranteed: 2 x 17,500 t (dry) Stacker capacity guaranteed: 225 t/h (dry)Reclaimer capacity guaranteed: 60 t/h (dry) Homogenizing ratio at 100% filling guaranteed 11:1 Standard deviation of Carbon, but not less than 1% standard deviation at Test Duration: 2 Test each 8 hours Maximum interruption: none Shared Raw Material Storage:Guaranteed Storage Capacities : High Grade Limestone 6,750 t (dry)River Sand 2,750 t (dry)Quarry Sand 2,000 t (dry)Iron Ore 10,000 t (dry)Reserve (equivalent to limestone) 2,000 t (dry) Guaranteed stacking capacity: High Grade Limestone and Quarry Sand Stacker 1,200 t/h (dry)River Sand Truck / Dozer 100 t/h (dry)Iron Ore Truck / Dozer 100 t/h (dry) Reclaiming guaranteed for each: High Grade Limestone 2 x 90 t/h (wet) by LoaderBoth Sand types 1 x 90 t/h (wet) by LoaderIron Ore 1 x 90 t/h (wet) by Loader Precondition: Moisture content High Grade Limestone 2,5 % MaximumSand 5 % MaximumIron Ore 22 % Maximum Test Duration: 2 Test each 8 hours Maximum interruption: none Gypsum Storage - Uncrushed:Total out-door storage capacity 10,000 t Feed size: 500 mm Maximum Feed Moisture 5 % MaximumStacking capacity guaranteed by loader 200 t/h (wet)Reclaiming capacity guaranteed by loader >100 t/h (dry)Gypsum/Iron Ore/Coal CrusherFunctionality must be given for:Feed size: Gypsum 100% < 500 mm 90% < 300 mmFeed size: Iron Ore 100% < 500 mm 90% < 300 mmFeed size: Coal 100% < 300 mm 90% < 100 mm Feed Moisture Gypsum 5 % Max Iron Ore 22 % Max Coal 12 % Max Output for gypsum guaranteed: 100 t/h (dry) Guaranteed product size: < 50 mm < 95 % < 80 mm 100 % Lifetime for wear element based on gypsum: 2 years Test Duration: 3 Test each 6 hoursMaximum interruption: 5 Minutes for each testSand Ship Unloading:Unloading capacity guaranteed for 300 t standard ship size1 x >100 t/h (dry) Emptying cargo hull 180 Minutes Sand grain size <10 mm 95 %<20 mm 100 %Precondition: moisture content 6 % Maximum Test Duration: 2 tests each 3 ship Maximum interruption: none General Emission Limits:NOx guaranteed < 500 mg/Nm3SO2 guaranteed << 400 mg/Nm3Noise at Plant Boundary:Daytime guaranteed ≤60 dB (A)Nighttime guaranteed ≤50 dB (A)Dedusting Filters:Process filters for Kiln and raw mill Cooler if applicable Cement mills Coal mill Process filter type Bag Standard filter type Bag Guarantees for process filters dust emissions < 10 mg/Nm3 Lifetime of bags for 4020-4 see extended warrantees Compressed air consumption for 4020-4 1,388 Nm3/h Lifetime of bags for cement mills and coal mill filters 15,000 operation hours Guarantees for standard filters dust emissions < 10 mg/Nm3lifetime of bags 15,000 operation hoursGuarantee of Specific Power Consumption at Guaranteed Capacity:Group including illumination and other production related consumers:20 Raw Material Preparation 06 kWh/t raw mix30 Raw Meal Preparation 14 kWh/t raw meal40 Clinker Production 01 kWh/t clinker50 C Manufacturing PII 5/5 closed 0 kWh/t cement50 C Manufacturing PII 5/5 open 7 kWh/t cement60 Cement Packing and Dispatch 82 kWh/t cement0640 Coal Fuel Preparation 90 kWh/t coalTotal specific power consumption based on the production of the Cement type PII 5 or PII 5 at 3600 cm^2/ “Blaine” produced on open circuit mills only, packed and loaded on trucks 5 kWh/t of cement, “non production related departments” indicative 2,100, kWh per yearThe Guaranteed Specific Power Consumption per group may be adjusted after the completion of the design if approved by the E However the guaranteed Total Specific Power Consumption (5 kwh/ton cement) must remain as Test Procedures for the Individual Areas and/or Sub-Systems:The Tests shall be fulfilled within the operation hours specified in Doc 4 [Group Limits and Requirements] wherever Guaranteed Capacities: The capacities of the various equipment will be determined by weighing the resultant product either continuously by means of the weighing equipment of the department or by means of the weighing bridges of the plant using trucks after calibration of the weighing Measuring tolerance will not be more than +5% Power Consumption: The power consumption of the respective department will be measured on the medium voltage Measuring tolerance will not be more than +1% Fuel Consumption: The fuel consumption of the respective department will be measured by the calibrated counters of the fuel dosing Measuring tolerance will not be more than +5 % Heat Value of Fuel: The heat value of the fuel will be determined by a local neutral authority three times during the test period of the respective PA2) Interlocked TestA1) Production Performance Guarantee Area 20, 30, 40, 06 and related auxiliary departments:Precondition: Operation times shall be as given in Doc 4 [Group Limits and Requirements]1 test 72 hoursMaximum interruption of clinker production: 3 times 15 minutes per 24 hours or 1 times 30 minutes within 72 hoursThis test may be combined in sequence with the tests “A1) Individual Production performance Test” for the Pre-Heater Kiln and interlocked test for “A2) A2) Production Performance Guarantee Interlocked Areas 50, 60 and related auxiliary departments:Precondition: Operation times shall be as given in Doc 4 [Group Limits and Requirements]1 test 72 hoursMaximum interruption of cement production/dispatch: 3 times 15 minutes per 24 hours or 1 times 30 minutes within 72 hours This test may be combined in sequence with the tests “A1) Individual Production Performance Test” for the Pre-Heater Kiln and interlocked test for “A1)A3) Production Performance Guarantee Area 40 Clinker Production (reliability/availability):This test can be carried out either before or after Taking-The guaranteed performance shall be not less than 90,000 tons of qualified clinker in 15 continuous daysMaximum Interruption: 16 hours accumulated for kiln feed but including only one (1) kiln main drive stopThis test may be combined in sequence with the “A1) Individual Test” for the Pre-Heater Kiln and interlocked test for “A1)B) Production Performance Guarantees for “Tests after Completion” B1) 1st Test after Completion:The “Tests after Completion” shall comprise the all described for A) Production Performance Guarantees “Tests on Completion” except “A3) Production Performance Guarantee for Area 40 Clinker Production Note! It is a condition of Contract that this Test for “Test after Completion” which is intrinsically liked to has to take place at least 3000hrs after the successful completion of the test “A3) B2) 2nd Test after Completion:The “Tests after Completion” shall comprise the all described for A) Production Performance Guarantees “Tests on Completion” except “A3) Production Performance Guarantee for Area 40 Clinker Production C) Entire Works Defects Notification (Warrantee) Period: For explanation see Doc 1 Clause Entire System warrantee for the Plant will be 15,000 Operation hours but not more than 730 calendar days for the rest of the W A Limited number of items as stated hereafter under D) Extended Defects Notification Pfor a D) Extended Defects Notification (Warrantee) Period: The Defects Notification Period shall be extended for the items described Precondition for the extended warrantees: the requirements of the manufacturer for operation and maintenance shall be strictly Just before Employer and Contractor and the quality shall jointly inspect end of the “Extended Warrantee Time”, the items of warranty shall be confirmed as “not reduced quality”, otherwise defects or damage shall be Remedy shall be provided and the “Defects Notification Period” shall be expired as stated in Doc 1 [Conditions of Contract]Raw mill main gear box 5 yearsRaw mill main motor bearings* 100,000 Operation hoursRaw mill fan motor bearings* 100,000 Operation hoursCement mill main gear box 4 yearsCement mill main motor bearings* 100,000 Operation hoursCoal mill main gear box 5 yearsCoal mill main motor bearings* 100,000 Operation hoursKiln tires 10 yearsKiln support rollers 10 yearsKiln main drive gear box 4 yearsKiln girth gear and pinion 6 years4020-4 Process Filter fan motor bearings* 100,000 Operation hours4020-4 Process Filter: bags 23,000 Operating hours4020-4 Process Filter bag cages 23,000 Operating hoursClinker Cooler grate plates: for Recuperation Zone 3,840,000 t of clinkerfor Other Zones 3,840,000 t of clinkerfor crusher wear elements 5,760,000 t of clinkerCorrosion of steel structures and/or machinery: 5 years*) The bearings of the motors shall have design lifetime of 100,000 operation
104 评论

jarvinia奈奈

那你可以留意各大报纸的寻搞启示不是每个都要找的。因为有些已经找好了1年的材料2006年全国、省级人文社科和自科核心期刊征稿启示一、全国水路运输类中文核心期刊《中国水运》学术版 《中国水运》由中华人民共和国交通部主管,全国水路运输类核心期刊,中国学术期刊光盘输入期刊,全国优秀科技期刊,学术版为月刊。标准刊号ISSN1006-7973。征稿范围:交通、运输、船舶、经济、管理、科研、思政、文法、教学、工程、电子、机械、化工等等。 《中国水运》投稿方式: 二、全国贸易经济类中文核心期刊《商场现代化》(录入北大2004版最新核心期刊目录)《商场现代化》由中国商业联合会主管、中商科学技术信息研究所主办、《商场现代化》杂志社编辑出版的一本国家级、全国贸易经济类核心期刊,标准刊号:ISSN1006-3102。本刊为旬刊。主要栏目:流通论坛 商业科技 商业研究 商业视角 市场调研 行业新知 资本运营 经营管理 营销策略 品牌战略 电子商务 区域经济 海外链接 国际经贸 热点分析 物流平台 企业文化 人力资源 投资分析 财会探析 财经论坛 经济与法 学术探讨 产业经济 超市连锁《商场现代化》投稿方式: (请指明所要投稿杂志)三、中国法学类核心期刊《法制与**》《法制与**》是中国法学类核心期刊,中国学术期刊网全文收录期刊,中国学术期刊综合评价数据库来源期刊,中国学术期刊(光盘版)全文收录期刊。本刊为旬刊。标准刊号ISSN100*-0592。征稿范围:以法律、管理类稿件为主,兼及经济、政治、文化、教育等内容,体现理论性与实务性相结合的特点。主要栏目:法制纵横、经济与法、法学园地、法治社会、政法论坛、管理视野、创新天地、学术沙龙、理论前沿、文化教育等。《法制与**》投稿方式: (请指明所要投稿杂志)四、中国人文社科核心期刊《当代***》《当代***》是中国人文社科核心期刊,中国学术期刊网全文收录期刊,中国学术期刊综合评价数据库来源期刊,中国学术期刊(光盘版)全文收录期刊。本刊为旬刊。标准刊号ISSN167*-8149。征稿范围:以经济、管理类稿件为主,兼及法律、行政管理、文化等内容,体现实务性的特点。主要栏目有:财政纵横、法制园地、管理之道、管理视野、创新论坛、人力资源、学术沙龙、理论广角等。《当代***》投稿方式: (请指明所要投稿杂志)五、优秀人文社科期刊《科教**》《科教**》是中国学术期刊网全文收录期刊,中国学术期刊综合评价数据库来源期刊,中国学术期刊(光盘版)全文收录期刊。本刊为月刊。标准刊号ISSN167*-7894。《科教**》以科学、教育类稿件为主,可涵盖人文、社科、自然科学等学科,体现综合理论性特点。主要栏目有:科教论坛、学科园地、科研教改、科技创新、教坛之星、后勤改革、管理园地、文化艺术、理论前沿、学术交流等。《科教**》投稿方式: (请指明所要投稿杂志)六、全国中文核心期刊、社会科学类国际交流期刊《江汉**》(增刊)《江汉**》(增刊)是全国中文核心期刊、社会科学类国际交流期刊,中国学术期刊网全文收录期刊。标准刊号:ISSN1003-85**。征稿范围:内容侧重于政治、经济、哲学、史学、法学等领域,重视新兴学科和交叉学科的研究,探讨社会主义现代化建设和改革开放出现的新问题,发表具有开拓创新见解的科学研究成果。《江汉**》(增刊)投稿方式: (请指明所要投稿杂志)七、优秀科技期刊《科技**》《科技**》是中国学术期刊网全文收录期刊,中国学术期刊综合评价数据库来源期刊,中国学术期刊(光盘版)全文收录期刊。本刊为旬刊,标准刊号:ISSN1672-379*。征稿栏目:高新技术、工程技术、工业技术、建筑科学、IT技术、电子商务、科教平台、资源与环境、学术论坛和科技动态。《科技**》投稿方式: (请指明所要投稿杂志)

304 评论

yanran8385

不要贵还不能慢,你的要求有点高,但凡快的都不便宜的。

111 评论

团子888888

你可以去中国水泥技术工程网上面找一下,应该有的啊。

197 评论

相关问答

  • 水泥技术期刊投稿

    你可以去中国水泥技术工程网上面找一下,应该有的啊。

    洋洋怕狗子 3人参与回答 2024-05-16
  • 水泥技术期刊

    建筑类的期刊可以发,如《四川水泥》《装饰装修天地》《城市建设理论研究》《江西建材》《建材与装饰》《中华建设》《建筑建材装饰》《建材发展导向》鉴于您是水泥成份检测

    我的歌声里AA 3人参与回答 2024-05-15
  • 水泥技术期刊官网

    天津水泥技术杂志社是1996-07-11在天津市北辰区注册成立的全民所有制,注册地址位于北辰区引河里北道1号。天津水泥技术杂志社的统一社会信用代码/注册号是91

    dp786639854 2人参与回答 2024-05-16
  • 水泥期刊投稿

    看一看文章《水泥方面论文哪些期刊会比较好发表》是不是能解决你的问题。

    gavin70606 3人参与回答 2024-05-13
  • 水泥技术杂志

    网站:水泥人网杂志:水泥装备技术全国型新干法水泥生产线名录

    梦溪shuer 3人参与回答 2024-05-13