首页 > 论文期刊知识库 > 水泥技术期刊投稿

水泥技术期刊投稿

发布时间:

水泥技术期刊投稿

你可以去中国水泥技术工程网上面找一下,应该有的啊。

不要贵还不能慢,你的要求有点高,但凡快的都不便宜的。

274 MILLION TPY PORTLAND CEMENT PRODUCTION PLANTCONTRACT DOCUMENTDoc 1Production Performance GuaranteesRevision 2003 A) Production Performance Guarantees for “Tests on Completion”A1) Individual Tests of Area, System or Sub-systemLimestone Quarry Operation – for information to CP2 -Capacity: 65,000 t per week (dry)Guaranteed 1,700 t/h (dry) Feed Moisture 5 % Max Feed size: 5 m MaxTest Duration:: 3 Test each 6 hoursMaximum interruption: no InterruptionQuaternary Quarry Operation – for information to CP2 -Capacity: 9,000 t per week (dry)Guaranteed 230 t/h (dry) Feed size: 5 m MaxFeed Moisture 13 % Min 27 % Average 40 % Max Test Duration:: 3 Test each 6 hoursMaximum interruption: no InterruptionLimestone/Quaternary CrusherGuaranteed output: > 1,100 t/h (dry)Feed size: 5 m Max Feed Moisture Limestone 5 % Max Quaternary 13 % Min Quaternary 27 % Average Quaternary 40 % Max Mix ratio Limestone 85 % Quaternary 15 % Guaranteed product size: <80mm 95 % <150mm 100 % Lifetime for hammers: 1250 Operation hours Test Duration: 3 Test each 6 hoursMaximum interruption: 5 Minutes for each testLimestone/Quaternary Long Belt ConveyorCapacity guaranteed > 1,250 t/h (dry)Limestone/Quaternary Mix Pre-Blending StorageFeed material: Product of the limestone/quaternary mix crusher Storage Capacity: > 50,000 t (dry) Stacker capacity guaranteed: > 1,200 t/h (dry) Reclaimer capacity guaranteed: > 520 t/h (dry) Blending effect: Standard deviation CaCO3 <5% Stacker: Test Duration: 3 Test each 6 hoursMaximum interruption: 5 Minutes for each testReclaimer: Test Duration: 3 Test each 6 hoursMaximum interruption: 5 Minutes for each test Raw Mill:Feed size: <80mm 95 % <150mm 100 % Feed Moisture H2O by weight 8 % Max Feed Composition Limestone/Quaternary 98 % MaxHigh Grade Limestone 15 % MaxIron Ore 6 % MaxSand 11 % Max Guaranteed output: ≥520 t/h (dry) Output fineness: ≤12% residue 80 micron ≤ 1% residue 200 micron Output moisture: H2O by weight ≤ 1 % Lifetime guarantee: Roller table and roller liners ≥15,000 Operating hoursand ≥ 7,275,000 Tons of raw meal Test Duration: 2 Test each 24 hours Maximum interruption: One time 15 Minutes for each testRaw Meal Homogenizing Silo:Capacity: 19,000 Ton Standard deviation in CaO of discharge raw meal guaranteed 2 % Max Homogenizing ratio at 50% filling degree guaranteed 5:1 Min Degree of emptying guaranteed 98 % Min Test Duration: 1st Test 36 Hours2nd Test 72 Hours Maximum interruption: 1st Test 2 Times 15 minutes2nd Test 2 Times 30 minutes Number of Samples: Not less than 1 sample per hourPreheater Kiln:Guarantees: Clinker quality for PII 5 cement has to be according to Chinese Regulations but of not less quality than specified in: Doc [Product Requirements ]Capacity ≥ 1,920,000 t of clinker in 320 daysresulting in ≥6,000 t clinker per day Free lime in clinker minimum 85% of production ≤ 0 % CaO maximum 15% of production ≤ 5% CaOCompression strength of clinker at 3,500+100cm^2/gr 3 days28 days >36 MPa >5 MPa Free lime (CaO) standard deviation 12 Specific heat consumption: ≤ 737 kcal/kg clinkerDust content after Preheater ≤ 50 g/Nm3 Fuel Distribution: Kiln fuel for guarantee test 40 %Calciner fuel for guarantee test 60 %Calciner: Design Guarantee fuel 100 % Anthracite Trial run for entitlement to Production Performance Tests: 7 continuous days ≥ 85 % of 6,000 t/d clinker resulting in > 35,700 t Maximum interruption in total: 105 minutes, raw meal feeding to kilnTest Duration: for producing minimum 18,000 ton of qualified clinker per test 3 tests (1 “on Completion” 2 “after Completion”) each test 72 Hours Maximum interruption: 15 Minutes per 24 hoursor 30 Minutes within 72 hoursClinker Cooler:Guarantees: Capacity of cooler for all size of Clinker fitting to kiln requirements > 6,000 t of clinker per day Clinker outlet temperature for all type of clinker (Above ambient temperature in the shade measured at the Cooler Building) ≤ 60 °C Cooler efficiency: ≥ 2 % At specific grate load: ≤ 45 t/d per m2At ambient temperature of: ≤30 °C Trial run for entitlement to Production Performance Tests: 7 continuous days ≥ 85 % of 6,000 t/d clinker resulting in > 35,700 t Maximum interruption in total: 105 minutes, stop of cooler driveTest Duration: for producing minimum 18,000 ton of qualified clinker per test 3 tests (1 “on Completion” 2 “after Completion”) each test 72 HoursMaximum interruption: 15 Minutes per 24 hoursor 30 Minutes within 72 hoursClinker Storage:Capacity 126,000 t clinker Guaranteed degree of emptying by gravity 87 % MinimumLifetime of Refractory Materials on Area 40:Kiln Inlet Zone 16,000 Operating hoursTransition zone Sintering zone 16,0008,000 Operating hoursOperating hoursPre-Heater and Calciner and Terliary Air Duct: 16,000 Operating hours Clinker cooler: High Temperature zone 10,000 Operating hoursLow Temperature zone 16,000 Operating hoursKiln hood: 10,000 Operating hoursCement Grinding:Guaranteed product temperature before silo ≤ 70 °CGuarantee performance PII 5 / PII 5 at 3,600 BlaineOn closed circuit mill (2 systems) 95 t/h eachOn open circuit mill (3 systems) 83 t/h eachIndicative performance data for Area 50: for each mill closed circuit kWh/t t/hPO 5 00 103PO 5 00 103PC 5 00 115for each mill open circuit kWh/t t/hPO 5 00 90PO 5 00 90PC 5 50 100 Guaranteed working hours of life time for lining and internal parts of mills: First Compartment Liners 15,000 Operating hoursSecond Compartment Liners 20,000 Operating hoursSlotted Plates for Partition 15,000 Operating hoursBlind Plates for Partition 15,000 Operating hoursSlotted Plates for outlet diaphragm 20,000 Operating hoursGrinding Media consumption 40 gram/tTest Duration for each mill: 2 times 24 hours Maximum interruption: 1 time 15 minutes each testCement Storage:Total capacity 90,000 t netSingle cell silo 2 x 1 cell each 15,000 t netDouble cell silo 4 x 1 cell each 10,000 t net 4 x 1 cell each 5,000 t net Guaranteed degree of emptying each silo 98 % MinimumRotary Packing Machines:Guaranteed total output for 50 kg bags: 2 x 100 t/h (loaded on rear open truck) Accuracy of Bag weight: According to Chinese For 20 single random bags of 50 kg, deviation in weight of each bag shall be not more or less than 500 Test Duration: 2 times 8 hours Maximum interruption: 15 minutes each test each Rotary Packing MachineBig Bag Loading Station:Guaranteed total output for 1,000 kg bags 1 x 40 t/hBulk Cement Truck Loading Station:Number of cement types to be loaded 5 Number of bulk loading systems 4 Guaranteed total output for each type of cement, measured from “Start Loading” to “End of Loading” 250 t/h for each Loading SystemBulk Cement Ship Loading:Guaranteed total loading time for barge of 300 dwt size from berthing to departure 75 minutesRaw Coal Ship Unloading:Unloading capacity guaranteed for 300 dwt ship size from berthing to departure 180 minutes Coal grain size <50 mm 95 %<80 mm 100 %Coal moisture content 12 % Maximum Test Duration: 2 tests each 3 ship Maximum interruption: none Coal Dust Silo:Guaranteed Total capacity 400 t coal dust Guaranteed degree of emptying 100 %Coal Mill:Feed size: <50mm 95 % <80mm 100 % Feed Moisture 12 % Max Feed Type Anthracite 100 % Guaranteed output: 45 t/h (dry) At output fineness: <5% residue 80 micron <5% residue 200 micron Output moisture: <1 % Lifetime guaranteed: Table liner and roller liners 15,000 Operating hoursbut not less than 675,000 Tons of Coal Dust Test Duration: 2 Test each 24 hours Maximum interruption: One time 15 Minutes for each testCoal Pre-Blending Storage:Coal grain size <50 mm 95 % min<80 mm 100 % max Coal moisture content, H2O by weight 12 % Maximum Storage capacity guaranteed: 2 x 17,500 t (dry) Stacker capacity guaranteed: 225 t/h (dry)Reclaimer capacity guaranteed: 60 t/h (dry) Homogenizing ratio at 100% filling guaranteed 11:1 Standard deviation of Carbon, but not less than 1% standard deviation at Test Duration: 2 Test each 8 hours Maximum interruption: none Shared Raw Material Storage:Guaranteed Storage Capacities : High Grade Limestone 6,750 t (dry)River Sand 2,750 t (dry)Quarry Sand 2,000 t (dry)Iron Ore 10,000 t (dry)Reserve (equivalent to limestone) 2,000 t (dry) Guaranteed stacking capacity: High Grade Limestone and Quarry Sand Stacker 1,200 t/h (dry)River Sand Truck / Dozer 100 t/h (dry)Iron Ore Truck / Dozer 100 t/h (dry) Reclaiming guaranteed for each: High Grade Limestone 2 x 90 t/h (wet) by LoaderBoth Sand types 1 x 90 t/h (wet) by LoaderIron Ore 1 x 90 t/h (wet) by Loader Precondition: Moisture content High Grade Limestone 2,5 % MaximumSand 5 % MaximumIron Ore 22 % Maximum Test Duration: 2 Test each 8 hours Maximum interruption: none Gypsum Storage - Uncrushed:Total out-door storage capacity 10,000 t Feed size: 500 mm Maximum Feed Moisture 5 % MaximumStacking capacity guaranteed by loader 200 t/h (wet)Reclaiming capacity guaranteed by loader >100 t/h (dry)Gypsum/Iron Ore/Coal CrusherFunctionality must be given for:Feed size: Gypsum 100% < 500 mm 90% < 300 mmFeed size: Iron Ore 100% < 500 mm 90% < 300 mmFeed size: Coal 100% < 300 mm 90% < 100 mm Feed Moisture Gypsum 5 % Max Iron Ore 22 % Max Coal 12 % Max Output for gypsum guaranteed: 100 t/h (dry) Guaranteed product size: < 50 mm < 95 % < 80 mm 100 % Lifetime for wear element based on gypsum: 2 years Test Duration: 3 Test each 6 hoursMaximum interruption: 5 Minutes for each testSand Ship Unloading:Unloading capacity guaranteed for 300 t standard ship size1 x >100 t/h (dry) Emptying cargo hull 180 Minutes Sand grain size <10 mm 95 %<20 mm 100 %Precondition: moisture content 6 % Maximum Test Duration: 2 tests each 3 ship Maximum interruption: none General Emission Limits:NOx guaranteed < 500 mg/Nm3SO2 guaranteed << 400 mg/Nm3Noise at Plant Boundary:Daytime guaranteed ≤60 dB (A)Nighttime guaranteed ≤50 dB (A)Dedusting Filters:Process filters for Kiln and raw mill Cooler if applicable Cement mills Coal mill Process filter type Bag Standard filter type Bag Guarantees for process filters dust emissions < 10 mg/Nm3 Lifetime of bags for 4020-4 see extended warrantees Compressed air consumption for 4020-4 1,388 Nm3/h Lifetime of bags for cement mills and coal mill filters 15,000 operation hours Guarantees for standard filters dust emissions < 10 mg/Nm3lifetime of bags 15,000 operation hoursGuarantee of Specific Power Consumption at Guaranteed Capacity:Group including illumination and other production related consumers:20 Raw Material Preparation 06 kWh/t raw mix30 Raw Meal Preparation 14 kWh/t raw meal40 Clinker Production 01 kWh/t clinker50 C Manufacturing PII 5/5 closed 0 kWh/t cement50 C Manufacturing PII 5/5 open 7 kWh/t cement60 Cement Packing and Dispatch 82 kWh/t cement0640 Coal Fuel Preparation 90 kWh/t coalTotal specific power consumption based on the production of the Cement type PII 5 or PII 5 at 3600 cm^2/ “Blaine” produced on open circuit mills only, packed and loaded on trucks 5 kWh/t of cement, “non production related departments” indicative 2,100, kWh per yearThe Guaranteed Specific Power Consumption per group may be adjusted after the completion of the design if approved by the E However the guaranteed Total Specific Power Consumption (5 kwh/ton cement) must remain as Test Procedures for the Individual Areas and/or Sub-Systems:The Tests shall be fulfilled within the operation hours specified in Doc 4 [Group Limits and Requirements] wherever Guaranteed Capacities: The capacities of the various equipment will be determined by weighing the resultant product either continuously by means of the weighing equipment of the department or by means of the weighing bridges of the plant using trucks after calibration of the weighing Measuring tolerance will not be more than +5% Power Consumption: The power consumption of the respective department will be measured on the medium voltage Measuring tolerance will not be more than +1% Fuel Consumption: The fuel consumption of the respective department will be measured by the calibrated counters of the fuel dosing Measuring tolerance will not be more than +5 % Heat Value of Fuel: The heat value of the fuel will be determined by a local neutral authority three times during the test period of the respective PA2) Interlocked TestA1) Production Performance Guarantee Area 20, 30, 40, 06 and related auxiliary departments:Precondition: Operation times shall be as given in Doc 4 [Group Limits and Requirements]1 test 72 hoursMaximum interruption of clinker production: 3 times 15 minutes per 24 hours or 1 times 30 minutes within 72 hoursThis test may be combined in sequence with the tests “A1) Individual Production performance Test” for the Pre-Heater Kiln and interlocked test for “A2) A2) Production Performance Guarantee Interlocked Areas 50, 60 and related auxiliary departments:Precondition: Operation times shall be as given in Doc 4 [Group Limits and Requirements]1 test 72 hoursMaximum interruption of cement production/dispatch: 3 times 15 minutes per 24 hours or 1 times 30 minutes within 72 hours This test may be combined in sequence with the tests “A1) Individual Production Performance Test” for the Pre-Heater Kiln and interlocked test for “A1)A3) Production Performance Guarantee Area 40 Clinker Production (reliability/availability):This test can be carried out either before or after Taking-The guaranteed performance shall be not less than 90,000 tons of qualified clinker in 15 continuous daysMaximum Interruption: 16 hours accumulated for kiln feed but including only one (1) kiln main drive stopThis test may be combined in sequence with the “A1) Individual Test” for the Pre-Heater Kiln and interlocked test for “A1)B) Production Performance Guarantees for “Tests after Completion” B1) 1st Test after Completion:The “Tests after Completion” shall comprise the all described for A) Production Performance Guarantees “Tests on Completion” except “A3) Production Performance Guarantee for Area 40 Clinker Production Note! It is a condition of Contract that this Test for “Test after Completion” which is intrinsically liked to has to take place at least 3000hrs after the successful completion of the test “A3) B2) 2nd Test after Completion:The “Tests after Completion” shall comprise the all described for A) Production Performance Guarantees “Tests on Completion” except “A3) Production Performance Guarantee for Area 40 Clinker Production C) Entire Works Defects Notification (Warrantee) Period: For explanation see Doc 1 Clause Entire System warrantee for the Plant will be 15,000 Operation hours but not more than 730 calendar days for the rest of the W A Limited number of items as stated hereafter under D) Extended Defects Notification Pfor a D) Extended Defects Notification (Warrantee) Period: The Defects Notification Period shall be extended for the items described Precondition for the extended warrantees: the requirements of the manufacturer for operation and maintenance shall be strictly Just before Employer and Contractor and the quality shall jointly inspect end of the “Extended Warrantee Time”, the items of warranty shall be confirmed as “not reduced quality”, otherwise defects or damage shall be Remedy shall be provided and the “Defects Notification Period” shall be expired as stated in Doc 1 [Conditions of Contract]Raw mill main gear box 5 yearsRaw mill main motor bearings* 100,000 Operation hoursRaw mill fan motor bearings* 100,000 Operation hoursCement mill main gear box 4 yearsCement mill main motor bearings* 100,000 Operation hoursCoal mill main gear box 5 yearsCoal mill main motor bearings* 100,000 Operation hoursKiln tires 10 yearsKiln support rollers 10 yearsKiln main drive gear box 4 yearsKiln girth gear and pinion 6 years4020-4 Process Filter fan motor bearings* 100,000 Operation hours4020-4 Process Filter: bags 23,000 Operating hours4020-4 Process Filter bag cages 23,000 Operating hoursClinker Cooler grate plates: for Recuperation Zone 3,840,000 t of clinkerfor Other Zones 3,840,000 t of clinkerfor crusher wear elements 5,760,000 t of clinkerCorrosion of steel structures and/or machinery: 5 years*) The bearings of the motors shall have design lifetime of 100,000 operation

水泥技术期刊

建筑类的期刊可以发,如《四川水泥》《装饰装修天地》《城市建设理论研究》《江西建材》《建材与装饰》《中华建设》《建筑建材装饰》《建材发展导向》鉴于您是水泥成份检测,GO期刊网推荐《四川水泥》,《四川水泥》创刊于1979年,由四川省经济与信息化委员会主办。是专门报导水泥工业实用技术及经验的地方水泥技术系列期刊。

《混凝土》杂志 我这里可以操作的

不要贵还不能慢,你的要求有点高,但凡快的都不便宜的。

水泥技术期刊官网

天津水泥技术杂志社是1996-07-11在天津市北辰区注册成立的全民所有制,注册地址位于北辰区引河里北道1号。天津水泥技术杂志社的统一社会信用代码/注册号是911201132394369572,企业法人高文,目前企业处于开业状态。天津水泥技术杂志社的经营范围是:水泥技术杂志出版、广告服务(发布水泥行业广告);水泥技术咨询服务。(许可经营项目的经营期限以许可证为准)(国家有专营、专项规定的、按专营、专项规定办理)。本省范围内,当前企业的注册资本属于一般。通过百度企业信用查看天津水泥技术杂志社更多信息和资讯。

不要贵还不能慢,你的要求有点高,但凡快的都不便宜的。

水泥期刊投稿

看一看文章《水泥方面论文哪些期刊会比较好发表》是不是能解决你的问题。

现在几乎找不到不收版面费和审稿费的期刊了。审稿费一般30元或 50元,版面费就不好说了,500元-2000元不等的。所有联系 都与 论文投稿者联系。

期刊的稿件录用流程大体为,作者将文章作为附件通过电子邮件投稿。编辑对作者的文章进行初审并做出处理意见。通过作者提供的电子邮件地址回复作者,如作者的文章被杂志社采用则同时发送电子版(用稿通知书)。期刊的稿件录用流程大体为,作者将文章作为附件通过电子邮件投稿。编辑对作者的文章进行初审并做出处理意见。通过作者提供的电子邮件地址回复作者,如作者的文章被杂志社采用则同时发送电子版(用稿通知书)。如文章未被采用,也同样通知作者。收到(用稿通知书)的作者须按照(用稿通知书)上的要求办理汇款及其他相关手续。杂志社收到汇款后,会发送(收款确认函)给作者,并通知作者文章发表的具体时间及期数。根据作者的要求,提供书面的(用稿通知书)、收据等证明资料。杂志社对作者的文章进行编辑、加工及印刷。杂志出版后,杂志社通过邮寄寄赠当期杂志给作者。具体时间周期因期刊不同会有差别,半年到一年都属于正常现象。

水泥技术杂志

网站:水泥人网杂志:水泥装备技术全国型新干法水泥生产线名录

水泥人网隶属北京中石商联集团旗下的一家水泥行业内的门户网站。集团成立于2006年,位于中国虚拟经济区北京文化创意产业园内,是一家经营图书出版、网站运营、广告代理、活动公关和会展组织的专业化传媒集团公司。水泥人网是服务于水泥行业的门户网站,为水泥人提供专业的视频报道、水泥咨询、水泥价格、水泥技术、项目动态等信息。办公地址:北京市石景山区阜石路166号泽洋大厦718室。集团旗下水泥媒体品牌包括水泥人网、《水泥装备技术》杂志、《全国新型干法水泥生产线名录》《水泥人》杂志。我们将传统纸媒与互联网新兴媒体结合起来服务于整个水泥行业。我们会在快速资讯传播、科研技术分享、行业信息整合等多方面全新的信息交流、商务合作的互动平台。

《水泥》杂志由中国建材协会主管,建材技术情报研究所主办,1974年创刊,以“面向生产,注重实用”为宗旨,发行量居全国建材科技期刊榜首,面向水泥厂、科研、设计和教学单位。 主要栏目:生产技术,生产设备,收尘环保,试验研究,标准介绍,电气控制,计量监测,分析测试,专题报道,技改交流等,适合于水泥及相关企业、科研院所、大专院校及设计单位的技术人员阅读参考。每期64页约10万字,大16开,图文并茂,内容实用。《中国冶金》创刊于1991年。作为中国金属学会的会刊,《中国冶金》是冶金行业唯一具有科技政策和技术导向性、多专业性、实用性的综合类科技期刊。该刊的主编是中国金属学会的秘书长李文秀教授。《中国冶金》为月刊、大16开本, 64页,向国内外公开发行。其主要内容包括:⑴报道学会活动:包括中国金属学会的活动计划、会议预告、征文通知、书刊介绍、会议总结/纪要、出国考察报告;学会总部、专业委员会、地方学会和团体会员单位的重大组织变更;学会的年度工作总结、工作经验介绍以及对个人会员、团体会员、专业委员会、地方学会的表彰等。⑵专题论述、技术文章和学术论文:设有专家论坛、专题报道、专业发展综述(特约文章)、战略研讨、企业管理、技术创新、节能环保、工艺装备、冶金工艺技术进展等栏目。⑶科技信息:国内外冶金企业的研究开发动态和生产建设动态等。《现代化工》创刊于1980年,是由中国化工信息中心主办的大型综合性化工技术类期刊。 《现代化工》以战略性、工业性和信息性为特色, 致力于科技成果向生产力的转化 ,全面报道国内外最新化工科研、技术应用和技术革新成果,探讨化工行业和科研领域的热点、焦点话题,报道内容广,发行范围大,是化工及其相关领域从事科研、设计、教学、信息研究和技术管理人员的首选综合性技术类期刊。 主要栏目:“专论与评述”、“技术进展”、“科研与开发”、“工艺与设备”、“市场研究”、“管理科学”、“海外纵横”、“知识介绍”、“国内综合信息”、“国外动态”、“开发导向”、“技术市场”。

  • 索引序列
  • 水泥技术期刊投稿
  • 水泥技术期刊
  • 水泥技术期刊官网
  • 水泥期刊投稿
  • 水泥技术杂志
  • 返回顶部