首页 > 论文期刊知识库 > 土木工程英文参考文献

土木工程英文参考文献

发布时间:

土木工程参考文献英文

English is the Civil Engineering Civil Engineering, civil engineering is literally, it is the construction of the project It means building objects that the construction on the ground, underground, water works facilities, equipment and materials to use in surveying, design construction, maintenance, repair and other professional Civil Engineering with the progress of the human society, has been transformed into large integrated disciplines, it has a number of branches, such as : construction, rail projects, road projects, bridge projects, special project structure, water drainage works, the port project, water, environmental engineering A total of six professional Civil Engineering : architecture, urban planning, civil engineering, construction and environmental engineering equipment, water drainage works and road bridge Civil Engineering as an important foundation subjects, its important attribute : an integrated, social, practicality, Civil Engineering for the development of the national economy and improve the living standards of the people provided important material and technological foundation for the revitalization of many industries played a catalytic role in the construction of fixed assets is a basic production process, the construction and real estate in many countries and regions become a pillar of the economyAncient Civil Engineering has a long time span, roughly 500 years before Christ from the original date in civil engineering activities to the 16 century Italian Renaissance, resulting in the rapid development of the Civil Engineering on the road today, and has experienced more than 2,000 During this period, due to the development of scientific theories and slow, there is no breakthrough in civil engineering Century from 17 pages to 40 years in the 20th century end of the Second World War 300 years, foreign construction made great Civil Engineering has entered a phase of quantitative Some theoretical development, the emergence of new materials, new tools of invention, the Civil Engineering Science is perfection and In modern times, after the end of World War II, many countries economic takeoff, the increasing advances of modern science, so as to provide a powerful impetus to further development and material People's living conditions continue to improve, more and more comfortable living environment for the inevitable in the circumstances, the construction of development directly to the Civil Engineering 土木工程的英文是Civil Engineering ,直译是民用工程,它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测,设计施工,保养,维修等专业技术。土木工程随着人类社会的进步而发展,至今已经演变成为大型综合性的学科,它已经出许多分支,如:建筑工程,铁路工程,道路工程,桥梁工程,特种工程结构,给水排水工程,港口工程,水利工程,环境工程等学科。土木工程共有六个专业:建筑学,城市规划,土木工程,建筑环境与设备工程,给水排水工程和道路桥梁工程。土木工程作为一个重要的基础学科,有其重要的属性:综合性,社会性,实践性,统一性。土木工程为国民经济的发展和人民生活的改善提供了重要的物质技术基础,对众多产业的振兴发挥了促进作用,工程建设是形成固定资产的基本生产过程,因此,建筑业和房地产成为许多国家和地区的经济支柱之一。古代的土木工程有很长的时间跨度,大致从公元前500年新石器时代出现原始的土木工程活动到16世纪末意大利的文艺复兴,导致土木工程走上迅速发展的道路为止,前后经历了两千多年。在这段时间内,由于科学理论发展及其缓慢,土木工程也没有突破习惯的发展。从17世纪中页开始到20 世纪40年代第二次世界大战结束为止的300年间,国外的建筑取得了长足的进步。土木工程进入了定量分析阶段。一些理论的发展,新材料的出现,新工具的发明,都使土木工程科学日渐完善和成熟。到了近代,二战结束之后,许多国家经济起飞,现代科学日益进步,从而为进一步发展提供了强大的动力和物质基础。人们生活水平的不断提高,必然要求越来越舒适的居住环境,在这种情况下,建筑的发展直接推动了土木工程的发展。总的来说土木工程是一门古老的学科,它已经取得了巨大的成就,未来的土木工程将在人们的生活中占据更重要的地位。地球环境的日益恶化,人口的不断增加,人们为了争取生存,为了争取更舒适的生存环境,必将更加重视土木工程。在不久的将来,一些重大项目将会陆续兴建,插入云霄的摩天大楼,横跨大样的桥梁,更加方便的交通将不是梦想。科技的发展,以及地球不断恶化的环境必将促使土木工程向太空和海洋发展,为人类提供更广阔的生存空间。近年来,工程材料主要是钢筋,混凝土,木材和砖材,在未来,传统材料将得到改观,一些全新的更加适合建筑的材料将问世,尤其是化学合成材料将推动建筑走向更高点。同时,设计方法的精确化,设计工作的自动化,信息和智能话技术的全面引入,将会是人们有一个更加舒适的居住环境。一句话,理论的发展,新材料的出现,计算机的应用,高新技术的引入等都将使土木工程有一个新的飞跃

土木工程的英文是Civil Engineering ,直译是民用工程,它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测,设计施工,保养,维修等专业技术。土木工程随着人类社会的进步而发展,至今已经演变成为大型综合性的学科,它已经出许多分支,如:建筑工程,铁路工程,道路工程,桥梁工程,特种工程结构,给水排水工程,港口工程,水利工程,环境工程等学科。土木工程共有六个专业:建筑学,城市规划,土木工程,建筑环境与设备工程,给水排水工程和道路桥梁工程。土木工程作为一个重要的基础学科,有其重要的属性:综合性,社会性,实践性,统一性。土木工程为国民经济的发展和人民生活的改善提供了重要的物质技术基础,对众多产业的振兴发挥了促进作用,工程建设是形成固定资产的基本生产过程,因此,建筑业和房地产成为许多国家和地区的经济支柱之一。古代的土木工程有很长的时间跨度,大致从公元前500年新石器时代出现原始的土木工程活动到16世纪末意大利的文艺复兴,导致土木工程走上迅速发展的道路为止,前后经历了两千多年。在这段时间内,由于科学理论发展及其缓慢,土木工程也没有突破习惯的发展。从17世纪中页开始到20 世纪40年代第二次世界大战结束为止的300年间,国外的建筑取得了长足的进步。土木工程进入了定量分析阶段。一些理论的发展,新材料的出现,新工具的发明,都使土木工程科学日渐完善和成熟。到了近代,二战结束之后,许多国家经济起飞,现代科学日益进步,从而为进一步发展提供了强大的动力和物质基础。人们生活水平的不断提高,必然要求越来越舒适的居住环境,在这种情况下,建筑的发展直接推动了土木工程的发展。总的来说土木工程是一门古老的学科,它已经取得了巨大的成就,未来的土木工程将在人们的生活中占据更重要的地位。地球环境的日益恶化,人口的不断增加,人们为了争取生存,为了争取更舒适的生存环境,必将更加重视土木工程。在不久的将来,一些重大项目将会陆续兴建,插入云霄的摩天大楼,横跨大样的桥梁,更加方便的交通将不是梦想。科技的发展,以及地球不断恶化的环境必将促使土木工程向太空和海洋发展,为人类提供更广阔的生存空间。近年来,工程材料主要是钢筋,混凝土,木材和砖材,在未来,传统材料将得到改观,一些全新的更加适合建筑的材料将问世,尤其是化学合成材料将推动建筑走向更高点。同时,设计方法的精确化,设计工作的自动化,信息和智能话技术的全面引入,将会是人们有一个更加舒适的居住环境。一句话,理论的发展,新材料的出现,计算机的应用,高新技术的引入等都将使土木工程有一个新的飞跃English is the Civil Engineering Civil Engineering, civil engineering is literally, it is the construction of the project It means building objects that the construction on the ground, underground, water works facilities, equipment and materials to use in surveying, design construction, maintenance, repair and other professional Civil Engineering with the progress of the human society, has been transformed into large integrated disciplines, it has a number of branches, such as : construction, rail projects, road projects, bridge projects, special project structure, water drainage works, the port project, water, environmental engineering A total of six professional Civil Engineering : architecture, urban planning, civil engineering, construction and environmental engineering equipment, water drainage works and road bridge Civil Engineering as an important foundation subjects, its important attribute : an integrated, social, practicality, Civil Engineering for the development of the national economy and improve the living standards of the people provided important material and technological foundation for the revitalization of many industries played a catalytic role in the construction of fixed assets is a basic production process, the construction and real estate in many countries and regions become a pillar of the economyAncient Civil Engineering has a long time span, roughly 500 years before Christ from the original date in civil engineering activities to the 16 century Italian Renaissance, resulting in the rapid development of the Civil Engineering on the road today, and has experienced more than 2,000 During this period, due to the development of scientific theories and slow, there is no breakthrough in civil engineering Century from 17 pages to 40 years in the 20th century end of the Second World War 300 years, foreign construction made great Civil Engineering has entered a phase of quantitative Some theoretical development, the emergence of new materials, new tools of invention, the Civil Engineering Science is perfection and In modern times, after the end of World War II, many countries economic takeoff, the increasing advances of modern science, so as to provide a powerful impetus to further development and material People's living conditions continue to improve, more and more comfortable living environment for the inevitable in the circumstances, the construction of development directly to the Civil Engineering

我毕业设计的时候翻译过英文论文,不过只有3000字,不知道行不行,如果需要给我发信息。

Improved nonlinear plastic hinge analysis of space frame structuresJY Richard Liew a,*, H Chen a, NE Shanmugam a, WF Chen ba Department of Civil Engineering, National University of Singapore, 10 Kent Ridge Crescent, Singapore 119260, Singaporeb School of Civil Engineering, Purdue University, West Lafayette, IN 47907, USAReceived 5 January 1999; received in revised form 17 August 1999; accepted 25 August 1999AbstractThis paper is concerned with second-order plastic hinge analysis of three-dimensional frame The beam–column formulationis based on the use of stability interpolation functions for the transverse displacements, and considers the elastic couplingeffects between axial, flexural and torsional The developed computer program can be used to predict accurately theelastic flexural buckling load of columns and frames by modelling each physical member as one It can also be used topredict the elastic buckling loads associated with axial-torsional and lateral-torsional instabilities, which are essential for predictingthe nonlinear behaviour of space frame The member bowing effect and initial out-of-straightness are also considered sothat the nonlinear spatial behaviour of structures can be captured with fewer elements per Material nonlinearity is modelledby using the concentrated plastic hinge Plastic hinge between the member ends is allowed to Numerical examplesincluding both geometric and material nonlinearities are used to demonstrate the robustness, accuracy and efficiency of the proposedanalytical method and computer Ó 2000 Elsevier Science L All rights Keywords: Advanced analysis; Buckling; Nonlinear analysis; Plastic hinges; Space frames; I IntroductionTwo-dimensional (2-D) plastic hinge analysis of planeframes composed of members with compact section,fully braced out-of-plane, has been the subject for investigationin recent The theory for advanced inelasticanalysis of rigid and semi-rigid 2-D frames has beenwell developed and verified by tests [1,2] These analysismethods fulfil the requirements for the prediction ofmember strength and stability, with some constraints,satisfying the conventional column and beam–columndesign limit-state Although there have beenmuch work on the plastic hinge analysis of 3-D framestructures, the issues related to different theoretical andnumerical formulations and their accuracy and efficiencyin solving large frameworks are not addressed Theresearch presented in this paper is an extension ofadvanced analysis for 2-D frames [2] to 3-D frames [3–5], reflecting the current trend towards the rationalisationof advanced analysis * Corresponding改进非线性塑性铰空间框架结构的分析摘要:这份研究报告表明三维的框架结构与二维逻辑性塑性铰的关联,梁柱公式化的表述并嵌入横断面移动为基准,并考虑轴力、弯曲和扭力的移位之间的关系。发达的计算机程序作出通过每个物质成分作为一个基本部件做模型的塔器和框架可弯曲的负载量,它也能预报可弯曲负载量与轴向扭力和横向扭力的不稳定性的关联,这对预报非线性空间结构的作用是必不可少的,以便非线性空间结构的性能和部分成分一些原理能被输入计算机。重要的非线性通过使用浓缩的塑性铰方式被制作模型,塑性铰和成分末端是容许存在。数值的例子包括集合学和重要的非线性,两者习惯于证明目的的分析方法和电脑程序的稳定性,精确性。

土木工程英文参考文献

SCC formwork pressure: Influence of steel rebars  Abstract  The formwork pressure exerted by a given Self Compacting Concrete (SCC) depends on its thixotropic behavior, on the casting rate and on the shape of the It can moreover be expected that, in the case of a formwork containing steel rebars, these should also play a In first part, the specific case of a cylindrical formwork containing a single cylindrical steel rebar is In second part, a comparison of the theoretical predictions to the experimental measurements of the pressure drop, after the end of casting SCC, was determined and the proposed model was Finally, an extrapolation is suggested of the proposed method to the case of a rectangular formwork containing a given horizontal section of steel rebars, which could allow the prediction of the formwork pressure during   Keywords: Fresh concrete; Rheology; Workability; Formwork presure; Thixotropy   Introduction  In most of the current building codes or technical recommendations [1], [2], [3] and [4], the main parameters affecting formwork pressure during casting are the density of concrete, the formwork dimensions, the pouring rate of concrete, the temperature, and the type of   However, it was recently demonstrated that, in the case of SCC, the thixotropic behaviour of the material played a major role [5] P Billberg, Form pressure generated by self-compacting concrete, Proceedings of the 3rd International RILEM Symposium on Self-compacting Concrete, RILEM PRO33 Reykjavik, Iceland (2003), 271–[5], [6], [7] and [8] It can be noted that this influence is in fact indirectly taken into account in the above empirical technical recommendations via the effect of temperature and type of the binder, which are both strongly linked to the ability of the material to build up a structure at rest [9], [10] and [11]  During placing, the material indeed behaves as a fluid but, if is cast slowly enough or if at rest, it builds up an internal structure and has the ability to withstand the load from concrete cast above it without increasing the lateral stress against the It was demonstrated in [7] and [8] that, for a SCC confined in a formwork and only submitted to gravity forces, the lateral stress (also called pressure) at the walls may be less than the hydrostatic pressure as some shear stress τwall is supported by the It was also demonstrated that this shear stress reached the value of the yield stress, which itself increased with time because of Finally, if there is no sliding at the interface between the material and the formwork [8], the yield stress (not less or not more) is fully mobilized at the wall and a fraction of the material weight is supported (vertically) by the The pressure exerted by the material on the walls is then lower than the value of the hydrostatic   Based on these results, the model proposed by Ovarlez and Roussel [7] predicts a relative lateral pressure σ′ ( ratio between pressure and hydrostatic pressure) at the bottom of the formwork and at the end of casting equal to:  (1)and a pressure drop Δσ′(t) after casting equal to:  (2)where H is the height of concrete in the formwork in m, Athix the structuration rate in Pa/s [10], R is the casting rate in m/s, e is the width of the formwork in m, g is gravity, t is the time after the end of casting and ρ is the density of the   As it can be seen from the above, the key point for the pressure decrease is that the shear stress on each vertical boundary of the formwork equals the static yield stress of the It can then be expected that, in the case of a formwork containing steel rebars, the stress at the surface of the rebars should also play a It is the objective of this paper to start from the model developed by Ovarlez and Roussel [7] and extend it to the case of reinforced As the steel rebars should have a positive effect on formwork design ( decreasing the formwork pressure), this could allow for a further reduction of the formwork   In first part, the specific case of a cylindrical formwork containing a single cylindrical steel rebar is In second part, a comparison of the theoretical predictions to the experimental measurements of the pressure drop, after the end of casting SCC, is determined and the proposed model is Finally, an extrapolation is suggested of the proposed method to the case of a rectangular formwork containing a given horizontal section of steel rebars, which could allow the prediction of the formwork pressure during    Influence of a vertical steel bar on the pressure decrease inside a cylindrical formwork  In this paper, SCC is considered as a yield stress material (in first step, thixotropy is neglected), and, for stresses below the yield stress, SCC behaves as an elastic material [7] In the following, cylindrical coordinates are used with r in the radius direction; the vertical direction z is oriented downwards (see F 1) The top surface (upper limit of the formwork) is the plane z = 0; the formwork walls are at r = R The bottom of the formwork is located at z = H An elastic medium of density ρ is confined between the cylindrical formwork and an internal cylindrical steel rebar defined by the boundary (r = rb) For the boundary condition, the Tresca conditions are imposed everywhere at the walls ( it is assumed that the shear stress at the walls is equal to the yield stress τ00 as argued by Ovarlez and Roussel [7] and demonstrated in [8]) In order to compute the mean vertical stress σzz(z) in the formwork, the static equilibrium equation projected on the z axis on an horizontal slice of material confined between two coaxial rigid cylinders can be written:   Evaluation of the structuration rate of SCC at rest   The vane test  The yield stress of the studied SCC was measured using a concrete rheometer equipped with a vane The vane geometry used in this study consisted of four 10 mm thick blades around a cylindrical shaft of 120 mm The blade height was 60 mm and the vane diameter was 250 The gap between the rotating tool and the external cylinder was equal to 90 mm which is sufficiently large to avoid any scaling effect due to the size of the gravel (Dmax = 10 mm here)  Tests were performed for four different resting times after mixing on different samples from the same Of course, working with the same batch does not allow for the distinction between the non-reversible evolution of the behavior due to the hydration of the cement particles and the reversible evolution of the behavior due to thixotropy [9] and [10] It can however be noted that the final age of the studied system ( from the beginning of the mixing step to the last vane test measurement) was of the order of 70 Although Jarny et [13] have recently shown, using MRI velocimetry, that a period of around 30 min exists, for which irreversible effects have not yet become significant compared to reversible ones, the final age of the system in the present study was over this However, no strong stiffening nor softening of the sample was visually spotted nor measured as it will be shown Finally, the data analysis proposed by Estellé et [14] was used for the yield stress    The plate test  The plate test appears to be a very convenient method to monitor the apparent yield stress evolution of a thixotropic material with It was first developed and used in [8] but more details about its application to other materials than cement can be found in [15]  The device is composed of a plate rigidly attached below a The plate is lowered into a vessel containing the SCC ( F 2) The apparent mass of the plate is continuously monitored versus time by recording the balance output with a The balance measurements have an uncertainty of ± 01 The vessel was made of smooth PVC and was cylindrical with a diameter of 200 mm and 200 mm in The plate was placed along the cylinder During the tests, the vessel was filled with material to a height of 200 The plate used was 3 mm thick, 75 mm wide and 100 mm It was covered with sand paper with an average roughness of 200 µ The sand paper was used to avoid any slippage between the material and the plate [8] The distance between the plate and the vessel walls was large enough compared to the size of the constitutive particles that the material can be considered as homogeneous [16] and [17] The height H of the immersed portion of the plate was measured before the start of the To ensure that all tests start with the suspension in similar condition, vibration was applied (frequency of 50 Hz, amplitude of 5 mm) for 30 This step is critical in order to ensure tests Variations between tests performed on the same material in the same experimental conditions were then less than 5%  --------------------------------------------------------------------------------  Full-size image (22K)  F Schematic of the plate   View Within Article  The plate test analysis is based on the fact that the slight deformation of the cement paste under its own weight allows for the transfer of a part of this weight to the plate by the mobilization of a shear stress on the This shear stress is equal to the maximum value physically acceptable, which is the yield stress (more details were given in [8], [15], [16] and [17]) The variation in apparent yield stress with time can then be calculated from the measured apparent mass evolution of the plate with time using the following relation:  (9)Δτ0(t)=gΔM(t)/2Swhere ΔM(t) is the measured variation in the apparent mass of the plate and S is the immerged    Laboratory cylindrical formworks  Two columns were simultaneously filled with the studied SCC The columns were made of the same PVC covered with the same sand paper as the plate The columns inner diameters were equal to 100 Each column was 1300 mm The thickness of the plastic wall was 3 A 25 mm diameter steel bar was introduced in the second column (F 3)

你是哪个省的啊 看看如果可以的话 可以给你一份全面的

外文文献自己去sciencedirect,springerlink等外文数据库下载啊去自己的学校图书馆主页会找到很多外文数据库的中文文献到知网,维普等中文数据库下载,主页上也会有很多其他的上面的下载方式很多的,但只有在校园网内免费获取校园网外可以利用google学术搜索,有部分能免费下载另外还可以在百度文库等共享网站上找找

土木工程施工参考文献英文

我毕业设计的时候翻译过英文论文,不过只有3000字,不知道行不行,如果需要给我发信息。

有一篇施工监控的论文,你查收一下吧,希望对你有用!

已经发到你邮箱。

刚好我也在做毕业设计 把我的给你用吧! Traditional Construction ProceduresAs mentioned before, construction under the traditional construction procedure is performed by While they would like to satisfy the owner and the building designers, contractors have the main objective of making a Hence, their initial task is to prepare a bid price based on an accurate estimate of construction This requires development of a concept for performance of the work and a construction time After a contract has been awarded, contractors must furnish and pay for all materials, equipment, power, labor, and supervision required for The owner compensates the contractors for construction costs and A general contractor assumes overall responsibility for construction of a The contractor engages subcontractors who take responsibility for the work of the various trades required for For example, a plumbing contractor installs the plumbing, an electrical contractor installs the electrical system, and an elevator contractor installs Their contracts are with the general contractor, and they are paid by the general Sometimes, in addition to a general contractor, the owner contracts separately with specialty contractors, such as electrical and mechanical contractors, who perform a substantial amount of the work require for a Such contractors are called prime Their work is scheduled and coordinated by the general contractor, but they are paid directly by the Sometimes also, the owner may use the design-build method and award a contract to an organization for both the design and construction of a Such organizations are called design-build One variation of this type of contract is employed by developers of groups of one-family homes or low-rise apartment The homebuilder designs and constructs the dwellings, but the design is substantially completed before owners purchase the Administration of the construction procedure often is Consequently, some owners seek assistance from an expert, called a professional construction manager, with extensive construction experience, who receives a The construction manager negotiates with general contractors and helps select one to construct the Managers usually also supervise selection of During construction, they help control costs, expedite equipment and material deliveries, and keep the work on In some cases, instead, the owner may prefer o engage a construction program manager, to assist in administrating both design and Construction contractors employ labor that may or may not be Unionized craftspeople are members of unions that are organized by construction trades, such as carpenter, plumber, and electrician unions, Union members will perform only the work assigned to their During construction, all work should be For this purpose, the owner, often through the architect and consultants, engages The field inspectors may be placed under the control of an owner’s representative, who may be titled clerk of the works, architect’s superintendent, engineer’s superintendent, or resident The inspectors have the responsibility of ensuring that construction meets the requirements of the contract documents and is performed under safe Such inspections may be made at frequent In addition, inspections also are made by representatives of one or more governmental They have the responsibility of ensuring that construction meets legal requirements and have little or no concern with detailed conformance with the contract Such legal inspections are made periodically or at the end of certain stages of One agency that will make frequent inspections is the local or state building department, whichever has The purpose of these inspections is to ensure conformance with the local or state building Following is a description of the basic traditional construction procedure for a multistory After the award of a construction contract to a general contractor, the owner may ask the contractor to start a portion of the work before signing of the contract by giving the contractor a letter of intent or after signing of the contract by issuing a written notice to The contractor then obtains construction permits, as required, form governmental agencies, such as the local building, water, sewer, and highway The general contractor plans and schedules construction operations in detail and mobilizes equipment and personnel for the Subcontractors are notified of the contract award and issued letters of intent or awarded subcontracts, then are given, at appropriate times, notices to Before construction starts, the general contractor orders a survey to be made of adjacent structures and terrain, both for the record and to become knowledgeable of local A survey is then made to lay out Field offices for the contractor are erected on or near the If desirable for safety reasons to protect passersby, the required to be removed from the site are demolished and the debris is carted Next, the site is prepared to receive the This work may involve grading the top surface to bring it to the proper elevations, excavating to required depths for basement and foundations, and shifting of utility For deep excavations, earth sides are braced and the bottom is Major construction starts with the placement of foundations, on which the building This is followed by the erection of load-bearing walls and structural Depending on the height of the building, ladders, stairs, or elevators may be installed to enable construction personnel to travel from floor to floor eventually to the Also, hoists may be installed to lift materials to upper If needed, temporary flooring may be placed for use of As the building rises, pipes, ducts, and electric conduit and wiring are Then, permanent floors, exterior walls, and windows are At the appropriate time, permanent elevators are If required, fireproofing is placed for steel Next, fixed partitions are built and the roof and its covering are put is place,Finishing operations There include installation of the following: ceilings; tile; wallboard; wall paneling; plumbing fixtures; heating furnaces; air-conditioning equipment; heating and cooling devices for rooms; escalators; floor coverings; window glass; movable partitions; doors; finishing hardware; electrical equipment and apparatus, including lighting fixtures, switches, transformers, and controls; and other items called for in the drawings and Field offices, fences, bridges, and other temporary construction must be removed from the Utilities, such as gas, electricity, and water, are hooked up to the The sit is landscaped and Finally, the building interior is painted and The owner’s representatives then give the building a final If they find that the structure conforms with the contract documents, the owner accepts the project and gives the general contractor final payment on issuance by the building department of a certificate of occupancy, which indicates that the completed building meets building-code 传统的施工程序众所周知,在传统的施工程序中进行施工的承包商。尽管他们想满足业主和建筑设计师的要求,但是最终还是以赚取利润为主要目标的。因此,他们最初的任务是对编写投标价格的建筑成本进行准确的估计。这就需要进行前期调查的工作并且做出施工时间表。等合约批出后,施工方必须提供所有材料并支付其费用,设备,电力,劳动力。业主此时需要进行必要的监督。一个总承包商承担一个建筑整体的责任。从事分包的承建商则需承担建造工程所需的各个工作。例如,管道承包商安装水管,电业承办商安装电气系统,电梯则由电梯承包商安装。他们与总承包商签订合同,费用由总承包商支付。有时候,除了一个总承包商,还有各种专业承包商,如电气和机械承包商,执行工作时需要与业主签订合同。这种承包商被称为间接承包商。他们的工作,由总承包商协调,但它们都是由业主直接联系。还有些时候,业主可以使用设计建造方法同时兼有设计和建筑施工单位的职能。这些单位被称为设计建造承包商。这方面的一个类型的合同聘用的变化是由一户住宅或低层住宅建筑群的开发。在房屋建筑设计和建造的住房,但设计之前需要由购买房屋的业主完成。施工过程管理往往是困难的。因此,一些业主会去寻求专家的协助,这些专家被称为专业施工经理,他们具有丰富的施工经验。施工经理与总承包商进行谈判,并选择其中一个项目。施工经理通常还监督分包商。在施工期间,它们有助于控制成本,加快运送设备和材料,并保持工作的进度。在依法行政,协助设计和建设的情况下,业主可以选择从事建筑项目经理。建筑承包商雇用的劳动力,一般有大工和小工。大工再建筑工程中从事技术活,如木工,管道工,工会成员和电工工会,小工则执行了分配给他们的工作。在施工期间,一切工作都要验收。因此,业主通过建筑师和监理经常进行督查。可能是名为工程员,建筑师或驻地工程师。作为业主的代表实地视察。核查人员必须确保工程符合合同文件的要求,并在安全的条件下进行的责任。这种检查可作出重复。此外,验收还是需要一个或多个政府机构的代表。他们必须确保工程符合法律要求,并负责检查与合同文件是否一致。这种视察一般定期或在某些阶段施工结束以后进行。地方或国家建设部门具有管辖权。这些检查的目的是确保符合当地或国家的建筑规范。以下是传统多层建筑施工的基本程序。建造开始后合同授予开发商,业主可要求开发商开始施工之前签约给或之后签约发出书面通知的同时另一部分工作继续进行。紧接着施工方根据需要获取建筑许可证,例如当地的建设,供水,污水处理,政府机构和公路部门。总承包商的计划和进度详细施工作业以及动员项目设备和人员。分包商得到通知后,做出签订合同的意向或授予分包合同书,然后给出在适当的时候进行通知。在施工前启动,总承包商要进行的一项调查就是邻近结构和地形,这些都要记录在案,并要熟悉当地情况。这项调查结束以后,随即进行布局建设。承建商的现场办事处都建在施工现场或附近。为了安全起见,必须从脚手架上移除的东西,产生的碎片都要运走。下一步,该网架是为建设工程准备的。这项工作为地下室开挖和基础开挖的深度,以及公用事业管道转移找到正确的标高。深挖掘,土方支撑,底部排出。建筑开始于基础上,然后是承重墙和结构框架的施工。梯子,楼梯,或电梯的安装,可让施工人员往返于各个楼层。此外,可安装卷扬机来运送材料。由于建筑高度的上升,管道,电力管道和线路安装以及永久地板,外墙,窗户和构造的影响。在适当的时候,永久的电梯安装。再需要的情况下可以安装防火卷帘。其次,屋顶等地方也需要安装。精加工工序安装有包括以下内容:天花板,瓷砖,墙板,墙壁镶板,水管装置,加热炉,空气调节设备,加热和冷却室装置;自动扶梯;地板,窗户玻璃;活动板,门;电气设备和仪器,包括照明灯具,开关,变压器,控制器,遵照项目的图纸和规格。外地办事处,围栏,桥梁和其他临时建筑,公共设备,如天然气,电力管道,水管,都连接到建筑上。最后,是建筑物内部的打扫和清洗。业主的代表,会给建设工程作最后检查。如果他们满意并认为符合合同文件,那么业主接受该项目,并交给总承包商的一个占用证书,这表明,总承包商已完成建设,建设部门再根据建筑规范的要求发放最后付款。请采纳。

土木工程论文英文参考文献

已经发到你邮箱。

English is the Civil Engineering Civil Engineering, civil engineering is literally, it is the construction of the project It means building objects that the construction on the ground, underground, water works facilities, equipment and materials to use in surveying, design construction, maintenance, repair and other professional Civil Engineering with the progress of the human society, has been transformed into large integrated disciplines, it has a number of branches, such as : construction, rail projects, road projects, bridge projects, special project structure, water drainage works, the port project, water, environmental engineering A total of six professional Civil Engineering : architecture, urban planning, civil engineering, construction and environmental engineering equipment, water drainage works and road bridge Civil Engineering as an important foundation subjects, its important attribute : an integrated, social, practicality, Civil Engineering for the development of the national economy and improve the living standards of the people provided important material and technological foundation for the revitalization of many industries played a catalytic role in the construction of fixed assets is a basic production process, the construction and real estate in many countries and regions become a pillar of the economyAncient Civil Engineering has a long time span, roughly 500 years before Christ from the original date in civil engineering activities to the 16 century Italian Renaissance, resulting in the rapid development of the Civil Engineering on the road today, and has experienced more than 2,000 During this period, due to the development of scientific theories and slow, there is no breakthrough in civil engineering Century from 17 pages to 40 years in the 20th century end of the Second World War 300 years, foreign construction made great Civil Engineering has entered a phase of quantitative Some theoretical development, the emergence of new materials, new tools of invention, the Civil Engineering Science is perfection and In modern times, after the end of World War II, many countries economic takeoff, the increasing advances of modern science, so as to provide a powerful impetus to further development and material People's living conditions continue to improve, more and more comfortable living environment for the inevitable in the circumstances, the construction of development directly to the Civil Engineering 土木工程的英文是Civil Engineering ,直译是民用工程,它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测,设计施工,保养,维修等专业技术。土木工程随着人类社会的进步而发展,至今已经演变成为大型综合性的学科,它已经出许多分支,如:建筑工程,铁路工程,道路工程,桥梁工程,特种工程结构,给水排水工程,港口工程,水利工程,环境工程等学科。土木工程共有六个专业:建筑学,城市规划,土木工程,建筑环境与设备工程,给水排水工程和道路桥梁工程。土木工程作为一个重要的基础学科,有其重要的属性:综合性,社会性,实践性,统一性。土木工程为国民经济的发展和人民生活的改善提供了重要的物质技术基础,对众多产业的振兴发挥了促进作用,工程建设是形成固定资产的基本生产过程,因此,建筑业和房地产成为许多国家和地区的经济支柱之一。古代的土木工程有很长的时间跨度,大致从公元前500年新石器时代出现原始的土木工程活动到16世纪末意大利的文艺复兴,导致土木工程走上迅速发展的道路为止,前后经历了两千多年。在这段时间内,由于科学理论发展及其缓慢,土木工程也没有突破习惯的发展。从17世纪中页开始到20 世纪40年代第二次世界大战结束为止的300年间,国外的建筑取得了长足的进步。土木工程进入了定量分析阶段。一些理论的发展,新材料的出现,新工具的发明,都使土木工程科学日渐完善和成熟。到了近代,二战结束之后,许多国家经济起飞,现代科学日益进步,从而为进一步发展提供了强大的动力和物质基础。人们生活水平的不断提高,必然要求越来越舒适的居住环境,在这种情况下,建筑的发展直接推动了土木工程的发展。总的来说土木工程是一门古老的学科,它已经取得了巨大的成就,未来的土木工程将在人们的生活中占据更重要的地位。地球环境的日益恶化,人口的不断增加,人们为了争取生存,为了争取更舒适的生存环境,必将更加重视土木工程。在不久的将来,一些重大项目将会陆续兴建,插入云霄的摩天大楼,横跨大样的桥梁,更加方便的交通将不是梦想。科技的发展,以及地球不断恶化的环境必将促使土木工程向太空和海洋发展,为人类提供更广阔的生存空间。近年来,工程材料主要是钢筋,混凝土,木材和砖材,在未来,传统材料将得到改观,一些全新的更加适合建筑的材料将问世,尤其是化学合成材料将推动建筑走向更高点。同时,设计方法的精确化,设计工作的自动化,信息和智能话技术的全面引入,将会是人们有一个更加舒适的居住环境。一句话,理论的发展,新材料的出现,计算机的应用,高新技术的引入等都将使土木工程有一个新的飞跃

我毕业设计的时候翻译过英文论文,不过只有3000字,不知道行不行,如果需要给我发信息。

有一篇施工监控的论文,你查收一下吧,希望对你有用!

土木工程参考文献

参考文献就是你所引用的文字的来源,比如参考《建筑施工手册》2015版 xx编著,谢谢

外文文献自己去sciencedirect,springerlink等外文数据库下载啊去自己的学校图书馆主页会找到很多外文数据库的中文文献到知网,维普等中文数据库下载,主页上也会有很多其他的上面的下载方式很多的,但只有在校园网内免费获取校园网外可以利用google学术搜索,有部分能免费下载另外还可以在百度文库等共享网站上找找

  • 索引序列
  • 土木工程参考文献英文
  • 土木工程英文参考文献
  • 土木工程施工参考文献英文
  • 土木工程论文英文参考文献
  • 土木工程参考文献
  • 返回顶部